Roof permit rules in Spokane, WA

Short answer: A roof replacement appears to need a permit in Spokane, WA.

11 rules in all. What follows is taken line by line from City of Spokane Department of Building Services, with the sentence we relied on shown under each rule. Spokane publishes no roofing fee formula we could confirm, so there is no fee calculator.

Checked October 9, 2026. Information, not legal advice: confirm with the building department before you start.

Where to apply

Spokane, WA on a map of the United States.Spokane

Open the Spokane permit portal

Spokane roof permit rules at a glance

Each row is one confirmed statement from an official page; a row says “Not confirmed” when we found none.
Permit for a roof replacementRequired (implied)Spokane has a dedicated roofing permit with inspections; working without one can cost a double permit fee or a $257 civil infraction. static.spokanecity.org
Permit for a repairNot confirmedSpokane's own pages gave us nothing quotable for permit for a repair, so this row stays empty.
Who filesOwner or contractorThe permit is tied to a licensed and bonded contractor, or to the property owner if no contractor does the work. static.spokanecity.org
FeeStatedCity of Spokane lists a separate 'Re-Roof & Residential Remodel Permit Fee Table' and a 'Residential Remodels and Reroofs' fee estimator spreadsheet. my.spokanecity.org
InspectionsStatedRoofing jobs require a minimum of two inspections; a final inspection is required upon completion of the roof. static.spokanecity.org
Review timeNot confirmedNothing on Spokane's pages was specific enough to quote for review time.

The permit fee in Spokane

City of Spokane lists a separate 'Re-Roof & Residential Remodel Permit Fee Table' and a 'Residential Remodels and Reroofs' fee estimator spreadsheet.

“Residential Remodels and Reroofs (XLSX 95 KB) – fee estimator”

my.spokanecity.org. my.spokanecity.org copy kept by web.archive.org, dated December 10, 2025; the live page refused our server.

The 2025 building permit fee schedule shows a $65.00 processing fee, and a state building code fee of $6.50 for residential.

“Processing Fee State Building Code Fee $65.00 Commercial : $25.00 Residential : $6.50 plus $2.00 per additional dwelling unit.”

static.spokanecity.org. static.spokanecity.org copy kept by web.archive.org, dated October 11, 2025; the live page refused our server.

The same schedule has a technology fee of 2.5% of the building permit fee.

“Calculated at 2.5% of the Building Permit Fee”

static.spokanecity.org. static.spokanecity.org copy kept by web.archive.org, dated October 11, 2025; the live page refused our server.

Spokane: permit for a roof replacement

Spokane has a dedicated roofing permit with inspections; working without one can cost a double permit fee or a $257 civil infraction.

“The purpose of a roofing permit and subsequent inspections is to protect the interest and safety of property owners by documenting the work performed and ensuring established codes are followed.”

static.spokanecity.org. Source: static.spokanecity.org, as saved by the Internet Archive on August 2, 2025 (the live site blocked our request). This follows from the wording above rather than being stated outright. Spokane's roofing guide sheet describes the permit as the normal route; no area threshold stated on it.

Spokane: who files

The permit is tied to a licensed and bonded contractor, or to the property owner if no contractor does the work.

“Permits also substantiate that the work is being held accountable to a properly licensed and bonded contractor, if not the property owner”

static.spokanecity.org. Source: static.spokanecity.org, as saved by the Internet Archive on August 2, 2025 (the live site blocked our request).

Spokane: inspections

Roofing jobs require a minimum of two inspections; a final inspection is required upon completion of the roof.

“Roofing jobs require a minimum of two inspections.”

static.spokanecity.org. Source: static.spokanecity.org, as saved by the Internet Archive on August 2, 2025 (the live site blocked our request).

It is the permit applicant's responsibility to request the appropriate inspections and keep the work accessible and exposed until approved; failing to request them or covering work before approval may mean a $75 re-inspection fee and removal of sections of the roof at the applicant's expense.

“It is the responsibility of the permit applicant to request the appropriate inspections and to have the work remain accessible and exposed for inspection purposes until approved. Failure to request appropriate inspections or covering work prior to approval may necessitate a $75 re-inspection fee and the removal of sections of the roof at the applicant’s expense.”

static.spokanecity.org. Source: static.spokanecity.org, as saved by the Internet Archive on August 2, 2025 (the live site blocked our request).

Spokane: exceptions and extra rules

Failure to obtain a permit can result in fines and penalties from a double permit fee to a $257 civil infraction.

“Failure to obtain a permit can result in po ssible fines and penalties varying from a double permit fee to a $257.00 Civil Infraction.”

static.spokanecity.org. Source: static.spokanecity.org, as saved by the Internet Archive on August 2, 2025 (the live site blocked our request).

The total roofing layers may not exceed 2 after completion of a new roof; if there are 2 or more layers currently, all layers must be removed before installing a new layer.

“the total roofing layers may not exceed 2 after completion of a new roof. And, if there are 2 or more layers currently, then all l a y e r s m u s t b e r e m o v e d before installing a new layer.”

static.spokanecity.org. Source: static.spokanecity.org, as saved by the Internet Archive on August 2, 2025 (the live site blocked our request).

An ice barrier consisting of at least 2 layers of underlayment cemented together or of a self-adhering polymer modified bitumen sheet shall extend from the eave's edge to a point at least 24 inches (610 mm) inside the exterior wall line of the building.

“c o n s i s t s o f a t l e a s t 2 l a y e r s o f underlayment cemented together or of a self-adhering polymer modified bitumen sheet, shall extend from the eave’s edge to a point at least 24 inches(610 mm) inside the exterior wall line of the building”

static.spokanecity.org. Source: static.spokanecity.org, as saved by the Internet Archive on August 2, 2025 (the live site blocked our request).

Spokane: where to apply

Spokane runs online permitting through Accela Citizen Access.

Open the permit portal

“Online Permitting Building and development”

my.spokanecity.org. my.spokanecity.org copy kept by web.archive.org, dated December 10, 2025; the live page refused our server.

Spokane: what we could not confirm

  • Fee. We did not find this stated on the Spokane pages we checked on October 9, 2026. Ask the Spokane permit office before you rely on it.
  • Review time. We did not find this stated on the Spokane pages we checked on October 9, 2026. Ask the Spokane permit office before you rely on it.

The housing behind Spokane’s rules

  • The median home here was built in 1961. U.S. Census Bureau, American Community Survey (Spokane city), ACS 2019–2023 5-year.
  • 68.6 percent of the housing units were built before 1980. U.S. Census Bureau, American Community Survey (Spokane city), ACS 2019–2023 5-year.
  • 58.3 percent of occupied homes are lived in by their owner, the group that may file its own permit where the city allows it. U.S. Census Bureau, American Community Survey (Spokane city), ACS 2019–2023 5-year.
  • The Census County Business Patterns file counts 78 roofing contractor establishments in the area. U.S. Census Bureau, County Business Patterns, CBP 2023.
  • NOAA storm reports show 4 days with hail of 1 inch or more in the reporting period. NOAA NCEI Storm Events Database, 2014–June 2026.

Questions

Do I need a permit to replace a roof in Spokane?

Spokane has a dedicated roofing permit with inspections; working without one can cost a double permit fee or a $257 civil infraction.

Who applies for the roofing permit in Spokane, the owner or the roofer?

The permit is tied to a licensed and bonded contractor, or to the property owner if no contractor does the work.

What does the Spokane roofing permit cost?

City of Spokane lists a separate 'Re-Roof & Residential Remodel Permit Fee Table' and a 'Residential Remodels and Reroofs' fee estimator spreadsheet. The 2025 building permit fee schedule shows a $65.00 processing fee, and a state building code fee of $6.50 for residential.

Planning a re-roof in Spokane? Describe the job once and we send it to one local roofer, not five.

Start an inspection request