Border to Border

901 W 4th Ave, Hutchinson, KS 67501
Hutchinson, Kansas
Roofing Contractor
  • Roofing Contractor serving Hutchinson, Kansas — based at 901 W 4th Ave, Hutchinson, KS 67501.
  • Jobs on the listing: roof inspection, storm damage repair, emergency repair, roof repair, roof replacement.

Services Offered

Storm Damage Gutter Services Roof Replacement Emergency Repair Roof Inspection Roof Repair

Request a quote from Border to Border

Your request goes to Border to Border only. If they can't take it right now, we tell you and send nothing.

Free · No obligation · Sent to Border to Border only

How to check Border to Border on the Kansas record

statewide, Kansas does not license roofers; the trade is governed by local building permits at the city and county level

  1. Request a current certificate of insurance from the insurer; licenses and insurance are checked separately.
  2. An expiry before your finish date is a reason to ask questions.
  3. The registry name, the contract name and the truck lettering should all agree; the status should be active.
  4. Search the registry by number, then by name, because spellings differ between sources.

Storm record for Hutchinson, Reno County

Add up the hail reports NOAA recorded for Reno County since 2017 and you reach 85. On 27 of these days, stones came in at 1 inch (a quarter) or more. Golf-ball size or larger appeared on 14 days, and the biggest stone came in at 2.75 inches, near a baseball. 2026 is the last year with a 1.75-inch report.

1 hail report fell within 25 miles of Hutchinson over the past 90 days.

NOAA also lists 12 tornadoes here, the strongest rated EF3.

If a storm does come through, take dated photos of the roof first. Whoever you hire, Border to Border included, should put the inspection findings in writing.

92 percent of reports fall between April and July, and May alone has 36 percent. In 5 months of the year, hail is close to absent in the record.

The strongest recorded thunderstorm gust is 91 mph.

Reno County storm figures, NOAA Storm Events, 2014 to June 2026
MeasureValue
Reports in April to July92%
Largest stone, inches2.75
NOAA hail reports since 201785
Top gust, mph91
Tornadoes on file12
Top monthMay

The single largest day was July 13, 2015: a 2.75-inch stone, about the size of a baseball, reported near Willowbrook.

Heaviest full years for hail reports in Reno County
Calendar yearReportsBiggest stone, in
2015262.75
2016112.5
202461.75
1 in hail1 in hail1 in hail1 in hail1 in hail1 in hail1 in hail1 in hail1 in hail1 in hail1 in hail1 in hail1 in hail1 in hail1 in hail1 in hail1 in hail1 in hail1 in hail1 in hail1 in hail1 in hail1 in hail1 in hail1 in hail1 in hail1 in hail1 in hail1 in hail1 in hail1 in hail1 in hail1 in hail1 in hail1 in hail1 in hail1 in hail1 in hail1 in hail1 in hail1 in hail1 in hail1 in hail1 in hail1 in hail1 in hail1 in hail1 in hail1 in hail1 in hail1 in hail1 in hail1.25 in hail1.25 in hail1.25 in hail1.25 in hail1.25 in hail1.25 in hail1.25 in hail1.5 in hail1.5 in hail1.5 in hail1.5 in hail1.5 in hail1.5 in hail1.5 in hail1.5 in hail1.5 in hail1.5 in hail1.5 in hail1.5 in hail1.5 in hail1.5 in hail1.5 in hail1.5 in hail1.75 in hail1.75 in hail1.75 in hail1.75 in hail1.75 in hail1.75 in hail1.75 in hail1.75 in hail1.75 in hail1.75 in hail1.75 in hail1.75 in hail1.75 in hail1.75 in hail1.75 in hail1.75 in hail1.75 in hail1.75 in hail1.75 in hail1.75 in hail1.75 in hail1.75 in hail1.75 in hail1.75 in hail1.75 in hail2 in hail2 in hail2 in hail2 in hail2 in hail2.5 in hail2.5 in hail2.5 in hail2.5 in hail2.75 in hail2.75 in hail Hutchinson
1 in+ golf ball and up baseball and up. 111 reports of 1 inch or more carry coordinates. Each dot marks where hail was reported, not a storm path. Sources: NOAA Storm Events, US Census county outline.

The housing stock in Hutchinson

Hutchinson's median year built is 1961, which makes the typical home 65 years old. That is long enough for roughly 3 asphalt roof cycles, so replacement, not first install, is the usual job. Against a median home value of $122,600, a $9,900 mid-range asphalt roof is 8 percent of the house. 75.9 percent of homes in Hutchinson were built before 1980.

Homes in Hutchinson, Census American Community Survey
MeasureValue
Median build year1961
Detached and attached houses78.5%
Median home value$122,600
Median household income$58,801
Built before 198075.9%

Budgeting a roof in Hutchinson

Local pricing in Hutchinson sits roughly 12 percent under the national basis; asphalt shingles on 2,000 square feet cost $6,160 to $13,640. Divide price by years of life and the ranking changes: see the last column. Labor is part of the bill: the BLS median for roofers in Kansas is $47,190 a year.

Price by material, 2,000 sq ft, Hutchinson price index applied
MaterialLifespanPer year of lifeMiddle of range
3-Tab Asphalt Shingles15 to 20 years$470$8,140
Architectural Asphalt Shingles25 to 30 years$390$10,780
Clay Tile50 to 100 years$380$28,160
Cedar Shake20 to 30 years$700$17,600
Concrete Tile40 to 50 years$410$18,480
Standing Seam Metal50 to 70 years$470$28,160

Full cost guide for Hutchinson →

Hutchinson roofing questions

Has Reno County had large hail?
NOAA's biggest since 2017 entry for the county is 2.75 inches, comparable to a baseball, with 14 golf-ball days.
Is hail common around Hutchinson?
NOAA lists 85 hail reports for Reno County since 2017, on 27 days with stones of 1 inch or larger. May is the busiest month.
What time of year does Hutchinson get hail?
92 percent of the county's hail reports fall from April to July, and May alone has 36 percent.
What is a roof replacement price in Hutchinson?
Asphalt shingles on 2,000 square feet run $6,160 to $13,640 in Hutchinson, and the middle of that range is $9,900. Metal and tile cost more up front; the table above shows each material.
What is the typical house age in Hutchinson?
Median year built is 1961, which gives 65 years. A roof is younger than the house whenever it was replaced.
How soon should a roof be inspected after hail?
Take dated photos first, then book an inspection. Hail bruises can look minor from the ground, and insurers often set a filing deadline.

Own this business? Correct or claim this listing · Add a badge to your site · Report a mistake / ask for removal